CEGRIS II – Centreless grinding simulation part II

The industrially applied centreless grinding and especially centreless through-feed grinding process is characterised by its complexity and sensibility. This process is used for mass-production of rotationally symmetric workpieces such as valves and piston rods. Up to 150.000 workpieces can be produced per hour with this process. The aim of CEGRIS II is to minimise the long set-up times of this process in order to enhance manufacturing productivity of European companies by at least 40%. By reducing the set-up time of the centreless grinding a higher process flexibility can be obtained which again increases the productivity. This goal is approached by developing a 3D model of the very complex centreless through-feed grinding process. This model will then be used to develop a software tool that will enable not only to help set up the machine tool but will also be able to predict the process outcome by pre-setting a given machine set-up. This software tool, and the 3D model will also be embedded in a cave-environment for a visualisation of the workpiece 'travel' through the grinding gap. This can be used for process demonstration and also for specifying machining problems. Together with the software tool and the 3D model the cave-embedded simulation represents the outmost edge of technology. Another very important goal of CEGRIS II is the drastic reduction of water-pollution by about 80%. Using a new filtering system and again pushing the boundaries of the state-of-the-art in this project this goal will be aimed at. The challenge in this project can be seen in enhancing European competitiveness in a global market that is dominated by low-wage countries. By enhancing the productivity of the centreless through-feed grinding process that is used in numerous machining processes this goal can be met. It can even be estimated that this project will bring Europe into a leading position in this sector of production.

  •  2005-11-01  2008-10-31

  • EU Framework Program: FP6
  • FP6-NMP / NMP-2004-IST-NMP-1 / FP6-2004-IST-NMP-2
  • Overall Cost: 2.53  M.Eur Funding scheme: STREP  Ec Contribution: 1.65 Overall EC contribution; 65%
  • Project consortium members


     STUDER MIKROSA GMBH  INA SKALICA SPOL. S.R.O.  SUSPA CZ S.R.O.  TORUNSA S.A.  MARPOSS S.P.A  AWAS-POLSKA SP.Z O.O.  UNIVERSITY OF LJUBLJANA  RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN (R  GRINDAIX GMBH  SUSPA HOLDING GMBH  AWAS-SYSTEMY SP ZOO
  • Project partners aggregated budget


    Project budget data are not available for this project!
  • Countries aggregated budget


    Project budget data are not available for this project!
  • SK CZ ES IT PL SI DE 
  • FP6 Data provision: © European Union; Source: CORDIS, Cordis | This page is not provided by the European Commission 



 


Organizations
 

Projects
 
 

Back
 

Top Countries

 UK 7880
 DE 5173
 FR 4439
 ES 3721
 IT 3264
 NL 2662
 BE 1562
 CH 1300
 SE 1191
 EL 1113

Top Framework program

 FP7 25607
 FP6 10091
 H2020 4918

Top Framework program

 FP7-P 11127
 FP7-I 4562
 FP6-M 4530
 FP7-I 2365
 H2020 1311
 FP6-I 1102
 FP7-S 1038
 FP7-H 1008
 H2020 854
 FP7-N 806

Top EU organizations

 UOX 853
 MPG 772
 CEA 754
 CSIC 741
 UCL 688
 ETHZ 653
 EPFL 587
 VTT 466
 UEDIN 459
 DLR 428


Report an error:

Did you noticed an error? Please report here...
 

Back to top